Text File Extractor — Tunnel Project Parser

Tunnel Project Extractor

Upload a text file. Parsed values appear in structured containers.
Drop File Here or Click
Waiting for file…

Settings

    Project Details

      Main Inputs

        Reflectance and Depreciation Inputs

          Switch Levels

            Luminaire Details

            AliasFileQty

            Luminaire Switching

            Tunnel Layout

            File Preview

            No file loaded.
            AS1158.5 Figure 2.2 – Basic Flow (Reliable)

            AS1158.5 Figure 2.2 — Basic Decision Flow

            1) Is there see‑through?

            2) Is road element > 125 m long?

            3) Is road element > 75 m long?

            4) Does the tunnel length require an interior zone?

            5) What is the see‑through percentage (STP)?

            STP < 20% → TU3; STP 20–80% → TU4 (SSA required); STP > 80% → TU5.

            Recommended category