Tunnel Project Extractor
Upload a text file. Parsed values appear in structured containers.
Drop File Here or Click
Waiting for file…
Settings
Project Details
Main Inputs
Reflectance and Depreciation Inputs
Switch Levels
Luminaire Details
Alias | File | Qty |
---|
Luminaire Switching
Tunnel Layout
File Preview
No file loaded.
AS1158.5 Figure 2.2 — Basic Decision Flow
1) Is there see‑through?
2) Is road element > 125 m long?
3) Is road element > 75 m long?
4) Does the tunnel length require an interior zone?
5) What is the see‑through percentage (STP)?
STP < 20% → TU3; STP 20–80% → TU4 (SSA required); STP > 80% → TU5.